Emirates flight EK 109: Dubai - Malta via Larnaca

Ad box here 1220564027 I FlightWNum Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Daily 07:35 Dubai (DXB) 3 09:40 Larnaca (LCA)
EK 109 Non-stop Boeing 777-300ER (77W) 4:05 Valid until 2026-03-28
Daily 07:35 Dubai (DXB) 3 09:40 Larnaca (LCA)
EK 109 Non-stop Boeing 777-300ER (77W) 4:05 Effective from 2026-10-25
Daily 07:55 Dubai (DXB) 3 11:00 Larnaca (LCA)
EK 109 Non-stop Boeing 777-300ER (77W) 4:05 Effective 2026-03-29 through 2026-10-24
Daily 11:10 Larnaca (LCA) 13:00 Malta (MLA)
EK 109 Non-stop Boeing 777-300ER (77W) 2:50 Valid until 2026-03-28
Daily 11:10 Larnaca (LCA) 13:00 Malta (MLA)
EK 109 Non-stop Boeing 777-300ER (77W) 2:50 Effective from 2026-10-25
Daily 12:15 Larnaca (LCA) 14:00 Malta (MLA)
EK 109 Non-stop Boeing 777-300ER (77W) 2:45 Effective 2026-03-29 through 2026-10-24
Non-Direct Flights:
Daily 07:35 Dubai (DXB) 3 13:00 Malta (MLA)
EK 109 1-stop Boeing 777-300ER (77W) 8:25 Valid until 2026-03-28
Daily 07:35 Dubai (DXB) 3 13:00 Malta (MLA)
EK 109 1-stop Boeing 777-300ER (77W) 8:25 Effective from 2026-10-25
Daily 07:55 Dubai (DXB) 3 14:00 Malta (MLA)
EK 109 1-stop Boeing 777-300ER (77W) 8:05 Effective 2026-03-29 through 2026-10-24
Ad flat here 1377413384 I FlightWNum Lower
Parallax here DXB-MLA
Emirates flight EK 109:
Dubai - Malta via Larnaca
Ad mobi flat here (320x100px) 6074960173 M FlightWNum Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Emirates EK109
07:35

09:40
Valid until 2026-03-28
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:05, non-stop
Boeing 777-300ER (77W)

Direct Flights:

Emirates EK109
07:35

09:40
Effective from 2026-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:05, non-stop
Boeing 777-300ER (77W)

Direct Flights:

Emirates EK109
07:55

11:00
Effective 2026-03-29 through 2026-10-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 4:05, non-stop
Boeing 777-300ER (77W)

Direct Flights:

Emirates EK109
Valid until 2026-03-28
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:50, non-stop
Boeing 777-300ER (77W)

Direct Flights:

Emirates EK109
Effective from 2026-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:50, non-stop
Boeing 777-300ER (77W)

Direct Flights:

Emirates EK109
Effective 2026-03-29 through 2026-10-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:45, non-stop
Boeing 777-300ER (77W)

Non-Direct Flights:

Emirates EK109
07:35

13:00
Valid until 2026-03-28
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 8:25, 1-stop
Boeing 777-300ER (77W)

Non-Direct Flights:

Emirates EK109
07:35

13:00
Effective from 2026-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 8:25, 1-stop
Boeing 777-300ER (77W)

Non-Direct Flights:

Emirates EK109
07:55

14:00
Effective 2026-03-29 through 2026-10-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 8:05, 1-stop
Boeing 777-300ER (77W)
Ad mobi box here (300x250px) 8888825773 M FlightWNum Bottom Box
Parallax here DXB-MLA
  • EK 109 is an international flight departing from Dubai airport, United Arab Emirates (DXB) and arriving at Malta airport, Malta (MLA).
  • The flight runs via Larnaca (LCA).
  • The flight distance is 2519 miles, or 4053 km.
  • The timezone of the departure airport is UTC+4 , and the timezone of the arrival airport is UTC+1 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.