| FLIGHT SCHEDULE |
|---|
| Direct Codeshare Flights: |
| Mon-Wed,Fri,Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Valid until 2026-01-10 Codeshare flight, operated by Iberia.(IB 796) |
| Mon-Wed,Fri-Sun
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-01-11 through 2026-01-17 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Wed,Fri,Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-01-19 through 2026-01-26 Codeshare flight, operated by Iberia.(IB 796) |
| Mon-Wed,Fri,Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-01-27 through 2026-02-11 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Wed-Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-02-12 through 2026-02-23 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Tue,Thu-Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-02-24 through 2026-03-03 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Wed-Sat
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-03-04 through 2026-03-14 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Wed,Fri-Sun
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-03-15 through 2026-03-21 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Wed,Fri-Sun
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-03-23 through 2026-03-30 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Tue,Thu-Sun
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-03-31 through 2026-06-09 Codeshare flight, operated by Iberia.(IB 796) |
| Wed
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A319 (319) 3:10 Effective 2026-04-01 through 2026-06-10 Codeshare flight, operated by Iberia.(IB 796) |
| Wed,Thu
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A319 (319) 3:10 Effective 2026-06-11 through 2026-06-17 Codeshare flight, operated by Iberia.(IB 796) |
| Mon,Tue,Thu-Sun
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A320 (320) 3:10 Effective 2026-06-12 through 2026-10-24 Codeshare flight, operated by Iberia.(IB 796) |
| Wed
19:45
Vienna (VIE) 1
22:55
Madrid (MAD) 4 LA 1637 Non-stop Airbus A319 (319) 3:10 Effective 2026-06-24 through 2026-10-21 Codeshare flight, operated by Iberia.(IB 796) |