Jet2 flights from Leeds/Bradford (LBA) to Dalaman (DLM).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue 06:05 Leeds/Bradford (LBA) 13:25 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-10-29
Sun 08:10 Leeds/Bradford (LBA) 15:30 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-11-03
Fri 10:45 Leeds/Bradford (LBA) 18:05 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-03-14 through 2025-03-28
Fri 14:40 Leeds/Bradford (LBA) 22:00 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-11-01
Sun 15:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-10-27
Tue 16:30 Leeds/Bradford (LBA) 22:50 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-05-06
Fri,Sun 16:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2024-10-25
Fri 16:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-04-04 through 2025-04-25
Fri,Sun 16:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-04-27
Tue 16:40 Leeds/Bradford (LBA) 23:00 Dalaman (DLM) I
Jet2 LS 413 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2024-10-22
Wed 10:00 Leeds/Bradford (LBA) 16:20 Dalaman (DLM) I
Jet2 LS 453 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-04-02 through 2025-04-30
Wed 16:50 Leeds/Bradford (LBA) 23:10 Dalaman (DLM) I
Jet2 LS 453 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-05-07
Mon,Thu 08:00 Leeds/Bradford (LBA) 15:20 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-11-07 through 2024-11-18
Mon 10:00 Leeds/Bradford (LBA) 16:20 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-03-31 through 2025-04-28
Mon 14:40 Leeds/Bradford (LBA) 22:00 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-11-04
Mon 15:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-10-28
Sat 15:45 Leeds/Bradford (LBA) 23:05 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Operates only on 2024-11-02
Wed,Thu 15:50 Leeds/Bradford (LBA) 23:10 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective 2024-10-30 through 2024-10-31
Mon 16:35 Leeds/Bradford (LBA) 22:55 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-05-26
Mon 16:40 Leeds/Bradford (LBA) 23:00 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2024-10-21
Sat 16:45 Leeds/Bradford (LBA) 23:05 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2024-10-26
Sat 16:45 Leeds/Bradford (LBA) 23:05 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-04-26 through 2025-05-03
Mon,Sat 16:45 Leeds/Bradford (LBA) 23:05 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective 2025-05-05 through 2025-05-24
Sat 16:45 Leeds/Bradford (LBA) 23:05 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-05-31
Wed,Thu 16:50 Leeds/Bradford (LBA) 23:10 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Valid until 2024-10-24
Thu 16:50 Leeds/Bradford (LBA) 23:10 Dalaman (DLM) I
Jet2 LS 475 Non-stop Boeing 737-800 (73H) 4:20 Effective from 2025-05-01
Ad flat here 8924483383 I FlightInfo Lower
Parallax here LBA-DLM


Jet2 flights from Leeds/Bradford (LBA) to Dalaman (DLM).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Operates only on 2024-10-29
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-14 through 2025-03-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-05-06
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-04-04 through 2025-04-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-22
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-04-02 through 2025-04-30
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-05-07
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-07 through 2024-11-18
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-31 through 2025-04-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-04
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2024-10-30 through 2024-10-31
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-05-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-21
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-04-26 through 2025-05-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective 2025-05-05 through 2025-05-24
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-24
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-05-01
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:20, non-stop
Boeing 737-800 (73H)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here LBA-DLM
  • An international route departing from Leeds/Bradford airport, United Kingdom (LBA) and arriving at Dalaman airport, Turkey (DLM).
  • The flight distance is 1870 miles, or 3009 km.
  • The timezone of the departure airport is UTC+0 , and the timezone of the arrival airport is UTC+3 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 4:20.