WestJet flights from Atlanta (ATL) to Gainesville (GNV).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:
Daily 21:15 Atlanta (ATL) S 22:27 Gainesville (GNV)
WestJet WS 7267 Non-stop Boeing 717 (717) 1:12 Effective 2026-10-06 through 2026-10-24
Codeshare flight, operated by Delta Air Lines.(DL 3079)
Daily 21:20 Atlanta (ATL) S 22:29 Gainesville (GNV)
WestJet WS 7267 Non-stop Boeing 717 (717) 1:09 Effective 2026-01-06 through 2026-01-18
Codeshare flight, operated by Delta Air Lines.(DL 3079)
Daily 21:25 Atlanta (ATL) S 22:37 Gainesville (GNV)
WestJet WS 7267 Non-stop Boeing 717 (717) 1:12 Effective 2026-03-08 through 2026-04-12
Codeshare flight, operated by Delta Air Lines.(DL 3079)
Mon,Thu,Fri 21:32 Atlanta (ATL) S 22:40 Gainesville (GNV)
WestJet WS 7267 Non-stop Boeing 717 (717) 1:08 Effective 2026-02-12 through 2026-02-20
Codeshare flight, operated by Delta Air Lines.(DL 3079)
Mon,Thu,Fri,Sun 21:32 Atlanta (ATL) S 22:40 Gainesville (GNV)
WestJet WS 7267 Non-stop Boeing 717 (717) 1:08 Effective 2026-02-22 through 2026-03-06
Codeshare flight, operated by Delta Air Lines.(DL 3079)
Mon-Fri,Sun 14:55 Atlanta (ATL) S 16:06 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-04-13 through 2026-05-22
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Mon-Fri,Sun 14:55 Atlanta (ATL) S 16:06 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-05-25 through 2026-08-14
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Daily 14:55 Atlanta (ATL) S 16:06 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-08-15 through 2026-10-05
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Daily 14:55 Atlanta (ATL) S 16:04 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:09 Effective 2026-10-06 through 2026-10-24
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Wed,Fri,Sun 14:57 Atlanta (ATL) S 16:04 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:07 Effective 2026-01-21 through 2026-02-06
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Wed 14:57 Atlanta (ATL) S 16:04 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:07 Operates only on 2026-02-11
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Wed,Fri,Sun 14:57 Atlanta (ATL) S 16:06 Gainesville (GNV)
WestJet WS 8002 Non-stop Canadair CRJ 900 (CR9) 1:09 Effective 2026-02-13 through 2026-03-06
Codeshare flight, operated by Delta Air Lines.(DL 4714)
Wed,Fri,Sun 14:59 Atlanta (ATL) S 16:08 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:09 Effective 2026-03-08 through 2026-04-12
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:15 Atlanta (ATL) S 16:24 Gainesville (GNV)
WestJet WS 8002 Non-stop Canadair CRJ 900 (CR9) 1:09 Effective 2026-02-14 through 2026-03-07
Codeshare flight, operated by Delta Air Lines.(DL 4714)
Sat 15:15 Atlanta (ATL) S 16:26 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-04-18 through 2026-05-23
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat,Sun 15:15 Atlanta (ATL) S 16:26 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-05-24 through 2026-05-30
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:15 Atlanta (ATL) S 16:26 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:11 Effective 2026-06-06 through 2026-08-08
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Mon 15:20 Atlanta (ATL) S 16:28 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:08 Operates only on 2026-01-19
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:30 Atlanta (ATL) S 16:38 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:08 Operates only on 2026-01-24
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sun 15:30 Atlanta (ATL) S 16:38 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:08 Operates only on 2026-02-08
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:30 Atlanta (ATL) S 16:40 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:10 Effective 2026-03-14 through 2026-04-11
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:33 Atlanta (ATL) S 16:41 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:08 Operates only on 2026-01-31
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Sat 15:37 Atlanta (ATL) S 16:45 Gainesville (GNV)
WestJet WS 8002 Non-stop Boeing 717 (717) 1:08 Operates only on 2026-02-07
Codeshare flight, operated by Delta Air Lines.(DL 3133)
Daily 21:15 Atlanta (ATL) S 22:27 Gainesville (GNV)
WestJet WS 8741 Non-stop Boeing 717 (717) 1:12 Effective from 2026-10-25
Codeshare flight, operated by Delta Air Lines.(DL 1219)
Ad flat here 8924483383 I FlightInfo Lower
Parallax here ATL-GNV
prev   1 2


WestJet flights from Atlanta (ATL) to Gainesville (GNV).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Codeshare Flights:

Effective 2026-10-06 through 2026-10-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3079)
Duration: 1:12, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-01-06 through 2026-01-18
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3079)
Duration: 1:09, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-03-08 through 2026-04-12
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3079)
Duration: 1:12, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-02-12 through 2026-02-20
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3079)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-02-22 through 2026-03-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3079)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-04-13 through 2026-05-22
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-05-25 through 2026-08-14
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-08-15 through 2026-10-05
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-10-06 through 2026-10-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:09, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-01-21 through 2026-02-06
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:07, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-02-11
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:07, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-02-13 through 2026-03-06
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 4714)
Duration: 1:09, non-stop
Canadair CRJ 900 (CR9)

Direct Codeshare Flights:

Effective 2026-03-08 through 2026-04-12
Mon
-
Tue
-
Wed
Thu
-
Fri
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:09, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-02-14 through 2026-03-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 4714)
Duration: 1:09, non-stop
Canadair CRJ 900 (CR9)

Direct Codeshare Flights:

Effective 2026-04-18 through 2026-05-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-05-24 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-06-06 through 2026-08-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:11, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-01-19
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-01-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-02-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective 2026-03-14 through 2026-04-11
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:10, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Operates only on 2026-02-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by Delta Air Lines. (DL 3133)
Duration: 1:08, non-stop
Boeing 717 (717)

Direct Codeshare Flights:

Effective from 2026-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Codeshare flight, operated by Delta Air Lines. (DL 1219)
Duration: 1:12, non-stop
Boeing 717 (717)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here ATL-GNV
prev        Page 2 / 2
  • A domestic route departing from the Atlanta airport (ATL) and arriving at Gainesville airport (GNV).
  • The flight distance is 300 miles, or 483 km.
  • The timezone of both the departure and the arrival airports is UTC-5 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:07 and 1:19.