All airlines flying from Pittsburgh (PIT) to Las Vegas Harry Reid (LAS).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 06:30 Pittsburgh (PIT) 08:35 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 608 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-03-08 through 2026-04-05
Mon,Tue,Fri,Sun 05:10 Pittsburgh (PIT) 07:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 747 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Valid until 2026-01-04
Sat 07:05 Pittsburgh (PIT) 09:00 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 747 Non-stop Boeing 737 MAX 8 (7M8) 4:55 Valid until 2026-01-03
Sun 18:05 Pittsburgh (PIT) 19:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 974 Non-stop Boeing 737-800 (73H) 4:45 Operates only on 2026-05-24
Sun 20:00 Pittsburgh (PIT) 22:00 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1501 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-03-08 through 2026-04-05
Sat 16:50 Pittsburgh (PIT) 18:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1541 Non-stop Boeing 737-700 (Scimitar Winglets) 4:40 Effective 2026-06-06 through 2026-08-01
Sat 05:30 Pittsburgh (PIT) 07:35 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1717 Non-stop Boeing 737-800 (73H) 5:05 Effective 2026-03-07 through 2026-04-04
Mon,Thu,Fri 06:30 Pittsburgh (PIT) 08:35 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1717 Non-stop Boeing 737-700 (Scimitar Winglets) 5:05 Effective 2026-03-05 through 2026-04-06
Sun 19:25 Pittsburgh (PIT) 21:10 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1883 Non-stop Boeing 737-800 (73H) 4:45 Effective 2026-04-12 through 2026-05-17
Sun 19:25 Pittsburgh (PIT) 21:10 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 1883 Non-stop Boeing 737-800 (73H) 4:45 Operates only on 2026-05-31
Mon 05:20 Pittsburgh (PIT) 07:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2031 Non-stop Boeing 737-800 (73H) 5:00 Operates only on 2026-01-05
Sat 12:10 Pittsburgh (PIT) 13:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2054 Non-stop Boeing 737 MAX 8 (7M8) 4:35 Effective 2026-06-06 through 2026-08-01
Thu,Fri,Sun 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-01-11 through 2026-01-16
Mon,Sun 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-01-19 through 2026-01-25
Thu,Fri,Sun 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-02-01 through 2026-02-06
Mon,Sun 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-02-09 through 2026-02-15
Mon,Tue,Thu 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-02-17 through 2026-02-23
Mon 05:00 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Operates only on 2026-03-02
Mon,Thu,Fri 05:10 Pittsburgh (PIT) 07:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-02-12 through 2026-02-16
Thu,Fri,Sun 05:10 Pittsburgh (PIT) 07:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:30 Effective 2026-02-20 through 2026-03-01
Sat 07:00 Pittsburgh (PIT) 09:15 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-01-10 through 2026-02-07
Mon-Fri 07:10 Pittsburgh (PIT) 09:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-01-06 through 2026-01-14
Tue-Fri,Sun 07:10 Pittsburgh (PIT) 09:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-01-18 through 2026-01-23
Mon-Fri 07:10 Pittsburgh (PIT) 09:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-01-26 through 2026-02-04
Tue,Wed,Sun 07:10 Pittsburgh (PIT) 09:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-02-08 through 2026-02-11
Tue,Wed 07:10 Pittsburgh (PIT) 09:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2261 Non-stop Boeing 737 MAX 8 (7M8) 5:15 Effective 2026-02-18 through 2026-03-04
Sun 17:35 Pittsburgh (PIT) 19:15 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2440 Non-stop Boeing 737 MAX 8 (7M8) 4:40 Effective 2026-06-07 through 2026-08-02
Tue,Wed 15:20 Pittsburgh (PIT) 17:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2680 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2026-04-07 through 2026-06-03
Sat 17:05 Pittsburgh (PIT) 18:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2680 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2026-04-11 through 2026-05-30
Sun 06:00 Pittsburgh (PIT) 07:35 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3163 Non-stop Boeing 737-800 (73H) 4:35 Effective 2026-06-07 through 2026-08-02
Wed,Thu 12:30 Pittsburgh (PIT) 14:25 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3239 Non-stop Boeing 737-800 (73H) 4:55 Valid until 2026-01-01
Mon 17:10 Pittsburgh (PIT) 18:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3239 Non-stop Boeing 737-800 (73H) 4:45 Operates only on 2026-01-05
Mon,Tue,Fri,Sun 18:55 Pittsburgh (PIT) 20:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3239 Non-stop Boeing 737-800 (73H) 4:55 Valid until 2026-01-04
Sun 19:05 Pittsburgh (PIT) 20:35 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3268 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective 2026-08-09 through 2026-09-27
Sun 05:40 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737-700 (Scimitar Winglets) 4:50 Effective 2026-04-12 through 2026-05-17
Sun 05:40 Pittsburgh (PIT) 07:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737-700 (Scimitar Winglets) 4:50 Operates only on 2026-05-31
Mon,Thu,Fri 06:45 Pittsburgh (PIT) 08:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737-800 (73H) 4:45 Effective 2026-04-09 through 2026-06-01
Sat 06:55 Pittsburgh (PIT) 08:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737-800 (73H) 4:45 Effective 2026-04-11 through 2026-05-30
Tue,Wed 07:10 Pittsburgh (PIT) 08:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2026-04-07 through 2026-06-03
Sun 07:10 Pittsburgh (PIT) 08:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3484 Non-stop Boeing 737-800 (73H) 4:45 Operates only on 2026-05-24
Tue,Wed 07:55 Pittsburgh (PIT) 09:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3496 Non-stop Boeing 737-700 (Scimitar Winglets) 5:00 Effective 2026-03-10 through 2026-04-01
Sun 13:30 Pittsburgh (PIT) 15:15 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3773 Non-stop Boeing 737-700 (Scimitar Winglets) 4:45 Effective 2026-04-12 through 2026-05-17
Sun 13:30 Pittsburgh (PIT) 15:15 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3773 Non-stop Boeing 737-700 (Scimitar Winglets) 4:45 Operates only on 2026-05-31
Mon,Thu,Fri 17:35 Pittsburgh (PIT) 19:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 3843 Non-stop Boeing 737-800 (73H) 4:45 Effective 2026-04-09 through 2026-06-01
Tue,Wed 15:55 Pittsburgh (PIT) 17:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4288 Non-stop Boeing 737-800 (73H) 5:00 Effective 2026-03-10 through 2026-04-01
Mon,Thu,Fri 16:05 Pittsburgh (PIT) 18:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4288 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-03-05 through 2026-04-06
Sat 19:40 Pittsburgh (PIT) 21:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4288 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-03-07 through 2026-04-04
Sat 12:40 Pittsburgh (PIT) 14:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4290 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Operates only on 2026-02-07
Sat 12:55 Pittsburgh (PIT) 14:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4290 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-01-10 through 2026-01-31
Mon,Thu,Fri 17:45 Pittsburgh (PIT) 19:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 4290 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Effective 2026-02-05 through 2026-02-09
Ad flat here 8924483383 I FlightInfo Lower
Parallax here PIT-LAS
1 2   next


All airlines flying from Pittsburgh (PIT) to Las Vegas Harry Reid (LAS).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2026-03-08 through 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Valid until 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Valid until 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:55, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-08 through 2026-04-05
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-06-06 through 2026-08-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:40, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:05, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-04-12 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:00, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-06-06 through 2026-08-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:35, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-11 through 2026-01-16
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-19 through 2026-01-25
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-01 through 2026-02-06
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-09 through 2026-02-15
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-17 through 2026-02-23
Mon
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-03-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-12 through 2026-02-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-20 through 2026-03-01
Mon
-
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 5:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-10 through 2026-02-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-06 through 2026-01-14
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-18 through 2026-01-23
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-26 through 2026-02-04
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-08 through 2026-02-11
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-18 through 2026-03-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:15, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:40, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-04-11 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-06-07 through 2026-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:35, non-stop
Boeing 737-800 (73H)

Direct Flights:

Valid until 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 4:55, non-stop
Boeing 737-800 (73H)

Direct Flights:

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Valid until 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 4:55, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-08-09 through 2026-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:30, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-04-12 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-04-09 through 2026-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-04-11 through 2026-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-04-07 through 2026-06-03
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:45, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-04-12 through 2026-05-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Operates only on 2026-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 4:45, non-stop
Boeing 737-700 (Scimitar Winglets)

Direct Flights:

Effective 2026-04-09 through 2026-06-01
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:45, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-10 through 2026-04-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 5:00, non-stop
Boeing 737-800 (73H)

Direct Flights:

Effective 2026-03-05 through 2026-04-06
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-03-07 through 2026-04-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Operates only on 2026-02-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-01-10 through 2026-01-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Direct Flights:

Effective 2026-02-05 through 2026-02-09
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here PIT-LAS
Page 1 / 2        next
  • A domestic route departing from the Pittsburgh airport (PIT) and arriving at Las Vegas Harry Reid airport (LAS).
  • The flight distance is 1904 miles, or 3065 km.
  • The timezone of the departure airport is UTC-5 , and the timezone of the arrival airport is UTC-8 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 4:30 and 5:30.